Author: @thompsonanointing

Date Updated: 10/19/22

Before the Call

  1. Set up POAP distributions:
  2. Create CC slides
    1. Fork these slides
  3. Tag speakers in #call-info
  4. Final tag 30-60 minutes before CC starts for unedited slides
  5. Post links before community call in #cc-links
  6. Verify recording of cc with A/V guild — @F.Anthony Shepherd

After the Call

  1. Drop a link to the CC note with timestamps and Recording in #cc-links
  2. Upload to YouTube
  3. Distribute POAPs through guild.xyz